root cutting – Top of Michigan Trails Council https://www.trailscouncil.org Connecting Northern Michigan by Trail Mon, 18 Dec 2017 16:07:07 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.6 /wp-content/uploads/cache/2019/09/cropped-TOMT_Logo/50812735.jpg root cutting – Top of Michigan Trails Council https://www.trailscouncil.org 32 32 Root cutting project protects local trails /root-cutting-protects-trails/ Mon, 18 Dec 2017 16:05:40 +0000 /?p=19437 Top of Michigan Trails Council (TOMTC), along with local units of government, have made a good dent in an important trail maintenance project in 2017.  The project addresses a problem that exists on paved trails in Charlevoix and Emmet counties: tree roots beneath the trail are causing the asphalt to erupt, creating bumps and cracks on the surface that are a hazard to trail users.

5H Irrigation and Maintenance of Petoskey was awarded a contract to complete the work, which involved using a vibratory plow with a 12” blade to cut the roots on approximately 30 miles of asphalt trail surface on the Little Traverse Wheelway and the North Western State Trails.

This work was begun in August on a section of the Wheelway near Bay Harbor, and the process was refined to continue work on the paved portion of the North Western State Trail (from M-119 in Petoskey to Terrace Street in Alanson) in November.

The cost for this work will be shared by TOMTC, Bear Creek, Little Traverse, Littlefield, Resort townships and the City of Petoskey. The Trails Council has received a large donation from a private donor to cover part of their share of the cost, but the organization is seeking support from trail users as well.

Tony Hoffman of 5H Irrigation reports that the process involves coordinating and obtaining necessary clearances from Miss Dig to locate and avoid utilities along the trail. He reports that he will be working on the segment of the Wheelway from M 119 to Division Road in the spring, and will also be cutting roots on the segment from Konle Road to Harbor Springs.

Hoffman commented, “These trails are well used by cyclists and pedestrians, and I know this because I use the North Western trail myself. It’s important that trail users not take them for granted. There is a cost to keeping them maintained.”

Jeff Winegard, Executive Director of TOMTC will continue to work with Prall to oversee this project, coordinating with local jurisdictions. The need for ongoing root cutting in the future will also be emphasized, and townships and other jurisdictions represented along the trails will be asked to build trail maintenance costs into future budgets.

Winegard stated, “These trails are an economic asset to our area, and it’s important that we maintain them so that they will be available for all to enjoy safely for many years to come.  A study done by MSU determined that trail users on the Little Traverse Wheelway spent an additional $750,000 annually in our area.”

For more information on the project, contact Winegard at (231) 348-8280, or email ed@trailscouncil.org. To support TOMTC’s trail maintenance mission, visit www.trailscouncil.org. Financial support can also be mailed to 1687 M 119, Petoskey, MI 49770.

A video of the root cutting process can be found HERE.

 

]]>
Root cutting trial proves successful /cutting-proves-successful/ Wed, 06 Sep 2017 14:15:49 +0000 /?p=18968 In cooperation with the City of Petoskey, TOMTC recently hired 5H Irrigation and Maintenance of Petoskey to cut roots along both sides of the Little Traverse Wheelway. Roots have been causing eruptions and bumps in our paved trails–a maintenance nightmare! This trial proved successful in heading off future problems. A video of the process can be found HERE.

The next step is to find funding for this immense project. We will keep you posted on our progress!

]]>
Request for Proposals – Root Cutting /root-cutting-rfp/ Tue, 28 Mar 2017 19:57:46 +0000 /?p=18030 Request for Proposals–Root Cutting on the Little Traverse Wheelway and Northwestern State Trail

1.0       PURPOSE

Top of Michigan Trails Council (TOMTC) is requesting the submission of proposals from qualified contractors to provide root cutting on both sides of the Little Traverse Wheelway (approximately   23 miles in length) and the paved section the North Western State Trail (approximately 7.5 miles in length). TOMTC is working collaboratively with Charlevoix County, City of Petoskey, and Emmet County to fund and complete the project.

2.0       PROJECT DESCRIPTION

The project requires a vibratory cutting device to safely sever the roots of encroaching trees on both sides of the Little Traverse Wheelway and the North Western State Trail.  The total linear length of the trail is approximately 60 miles (both sides of 30 miles of asphalt trail).  The project will begin before June 27, 2017 or after August 25, 2017.

3.0       SCOPE OF SERVICES

The contractor will:

  1. Coordinate and obtain necessary clearances from Miss Dig to locate and avoid utilities along the trail
  2. Use a vibratory plow set to a depth of 12 – 16 inches to sever roots along the trail
  3. Remediate the disturbed soil upon completion of the trenching

4.0       SELECTION PROCESS

The selection process and schedule will be as follows:

4.1        Advertisement – An advertisement for the Request for Proposals (RFP) will be published in the Petoskey News Review, and posted on the following websites: www.trailscouncil.org

All questions regarding this project should be directed to Jeff Winegard or his designee in writing or by email. In order to maintain equal access to information, firm representatives are not to contact anyone other than the individual named above.

Jeff Winegard, Executive Director, TOMTC 1687 M-119, Petoskey, MI 49770. Phone: 231.348.8280  Email: ed@trailscouncil.org

4.2       Inquiries/Questions – All inquiries/questions regarding this RFP must be directed to Jeff Winegard, by mail or email (see 4.1) and must reach the office by Thursday 12:00 PM on April 20, 2017.

4.3       Proposal Submittal – Written submittals must be received by TOMTC no later than Thursday 12:00 PM on April 27, 2017. Submittals received after this deadline will not be considered.   Proposal shall be submitted either by letter or email.

4.5       Contract Agreements – A contract agreement with the selected firm will be negotiated and executed at the time the project is started.

5.0       SELECTION CRITERIA

The selection of a firm will be based on the qualification information exhibited in both written and graphic form in the Contractor’s Submittal and reference checks. TOMTC may require interviews and reserves the right to interview or not interview firms as it determines to be necessary.

6.0        GENERAL PROVISIONS

6.1        Non-Warranty of Request for Qualifications – Due care and diligence has been used in preparing this RFP. However, TOMTC shall not be responsible for any error or omission in this RFP, nor for the failure on the part of the Contractor to ensure that they have all information necessary to effect their submittals.

6.2       Request for Clarification – TOMTC reserves the right to request clarification of information submitted and to request additional information of one or more Contractors, either orally or in writing.

6.3       Acceptance/Rejection of Submittals – TOMTC reserves the right to accept or reject any or all submittals in whole or in part, with or without cause, to waive technicalities, or to accept submittals or portions thereof which, in TOMTC’s judgment, best serve the interest of TOMTC. TOMTC reserves the right to allow alterations, modifications, or revisions to individual elements of the Scope of Services any time during the period of contracts which result from this RFP.

6.4       Americans with Disabilities Act (ADA) Compliance – TOMTC will comply with the Americans with Disabilities Act (ADA) which prohibits discrimination on the basis of a disability. TOMTC will make reasonable accommodations in all programs to enable participation by an individual with a disability who meets essential eligibility requirements.  If any accommodations are necessary, participants are encouraged to notify TOMTC staff.

6.5      Minority/Women/Small Business Enterprise – TOMTC does not discriminate against any person or business in pursuit of these opportunities on the basis of race, color, national origin, religion, sex, age, disability, or veteran’s status.

6.6       Insurance and Indemnity Requirements – To the extent permitted by law the Contractor shall indemnify and save harmless TOMTC, its agents and employees and assigns, its board, employees and agents, County of Charlevoix, County of Emmet, and City of Petoskey s from and against all loss, cost damages, expense and liability caused by sickness and disease to any person; or damage or destruction to property, real or personal; arising from the negligent acts, errors, or omissions of the Contractor  in the performance of professional services provided to TOMTC.

The Contractor further agrees to purchase and maintain during the life of any contracts entered into with TOMTC the following insurance with an insurance company acceptable to TOMTC and authorized to do business in the State of Michigan:

Automobile:  Bodily injury and property damage liability covering all owned, non-owned, and hired automobiles for limits of not less than $1,000,000 each person/ $1,000,000 each occurrence.

Comprehensive General Liability: Bodily injury and property damage liability insurance as shall protect the Consultant from claim of bodily injury or property damage which arises from operations of this contract.  The amounts of such insurance shall not be less than $1,000,000 bodily injury and property damage liability each occurrence/aggregate.  This insurance shall include coverage for product/completed operations and contractual liability assumed under the indemnity provision of this contract.  TOMTC, its board, employees and agents, the County of Charlevoix, County of Emmet, and City of Petoskey shall be listed as an “Additional Insured”

Consultant’s Professional Liability: In a limit of not less than $1,000,000.

Workers’ Compensation and Occupational Disease Insurance:

Coverage A – Worker’s Compensation: Meeting the statutory requirements of the State of Michigan

Coverage B – Employer’s Liability: $100,000 each accident / $100,000 disease – each employee / $500,000 disease – policy limits.

Certificates of such insurance will be furnished to TOMTC and shall contain the provision that TOMTC be given thirty days written notice of any intent to amend or terminate by either the Consultant or the insuring company.

END OF REQUEST FOR PROPOSALS

]]>